East End Booster Pump Station Project

Bid/RFP Status: 
Awarded
Bid/RFP Due Date: 
Thursday, October 5, 2023 - 2:00pm
Bid Awarded To: 
Michael A Becker General Contractor Inc.
Award Amount: 
$2,477,701.00

New booster pump station and associated site improvements. Booster pump station construction includes installation of a 34’-0” by 20’-0” concrete masonry unit building with two 100-hp and two 30-hp vertical turbine can pumps and an external emergency generator.  Grading work includes over excavation and providing fill to build up the site to finished grade and grading the stormwater pond.  Site Improvements will also include installation of a vault, site piping, including multiple waterline connections, and asphalt construction. The installation of the pump stations discharge piping will end at the property line and connect to a waterline that is being constructed as part of another project.

Engineer's estimate:  $2,758,000.00